Opening a new venue is a project management exercise in which technology is routinely left until last. Connectivity lead times, cabling dependencies, POS requirements and Wi-Fi design all collide in the final weeks — and the opening date does not move. This checklist is the sequence we use to avoid that outcome.
Start with connectivity, not equipment
Connectivity has the longest lead time and the least flexibility. Order the circuit early, confirm the survey date, and plan an interim connection — typically 4G/5G — for the period before the primary circuit is live. Do not assume the previous tenant’s connection can be reused, and do not assume the building is ready for fibre without a survey.
Cabling and cabinet planning
Structured cabling must be coordinated with the fit-out programme: cable routes, containment, cabinet location, power and cooling. Decisions made here are expensive to reverse. Confirm who is providing containment, who is terminating, and where the demarcation point sits between trades.
Network and Wi-Fi design
Design for the venue’s actual operations: POS terminals, kitchen display systems, staff devices, guest Wi-Fi, CCTV and access control. Each has different requirements for bandwidth, latency and separation. A wireless survey at design stage — even predictive — catches the awkward spaces before equipment is ordered.
Operational systems and segmentation
Separate guest, staff and business-critical device networks. Confirm which systems require static addressing, which need outbound access, and which must be isolated. Agree who administers each system and how access will be handed over.
Commissioning and handover
Testing should be against agreed requirements, not “it powers on”. Confirm connectivity failover, Wi-Fi coverage in key areas, POS functionality, CCTV recording and access control operation. Documentation — cabinet labelling, IP schedules, credentials — should be handed over formally.
The week-before checklist
- Primary circuit live, or interim connection confirmed and tested
- Failover tested, not just configured
- Wi-Fi validated in trading areas at expected device density
- POS, payment and kitchen systems tested end-to-end
- CCTV recording and retention verified
- Access control tested for staff and delivery access
- Support arrangements and escalation contacts agreed
Conclusion
New venue technology fails most often on sequencing, not on product choice. Treat connectivity, cabling and network design as early project decisions, and commissioning as a formal stage — and opening day becomes considerably less interesting.